Once the championship is over Monday, I'll use end of year stats to do a final update to the mod this year and add the court. I'll probably have it posted sometime next weekend.
Updated Final Four Court after Saturdays games. Removed much of the black spray paint area behind baskets as its not really visible. Added dotted line in place of black area. Add gold splash paint on sidelines. This most likely will be the final version added to the mod.

If you want to use this now download and drop in you game courts\assn folder to overwrite the one there now.
Updated link to version shown above.
Download link:https://www.mediafire.com/file/xn2djzsgzrpiikt/main2.jpg/file
Info about the court this year:
The two-tone wood court features the Final Four logo at its center, which is surrounded by sublimated stars that mimic the Indiana state flag. The keys are light blue and bleed into the baseline, which includes the words “NCAA Final Four” on both ends.
The sidelines, meanwhile, feature the phrases “Indy 2021,” “The Road Ends Here,” “Equality” and “Unity” along with a light blue and black paintbrush texture. Both the baselines and sidelines have a gold paint splatter effect that are supposed to “capture the motion and energy of the game.”
Manufactured by Connor Sports, the court is made entirely from sugar maple trees from Michigan’s Upper Peninsula. It is 70 feet by 140 feet, weighs roughly 37 tons and was installed following the conclusion of the Elite Eight on Tuesday night. It took roughly six hours from start to finish.